Haughton stage 2

The project

Haughton BES 3D

Haughton Solar Farm is a large-scale solar photovoltaic power station located in north Queensland’s Burdekin Shire (40km west of Ayr and 60km south of Townsville). 

The first 100MW stage for the solar farm was completed in 2019. The second stage of development for the Haughton Solar Farm proposes to construct a further 300MW of generating capacity which once constructed increases the solar farm’s total energy output to power approximately 232,000 homes.

Additionally, the second stage of the development includes a Battery Energy Storage System (BESS) that will improve the security of electricity supply as well as capturing excess solar energy generated during the middle of the day and supply it back to the grid when demand is higher, such as morning and evening periods.

The site was identified as an area highly suitable for efficiently capturing solar energy – the region has one of the highest levels of solar irradiance in Australia, receiving 2,095 KWh/m² per annum. The north-eastern corner of the development site directly adjoins the existing 275kV Powerlink transmission line, providing the opportunity to connect to the NEM.

 

Local benefits

Pacific Blue has a strong track record of delivering lasting social, environmental, and economic benefits to the local communities in which our projects are located. These include:

  • Upwards of 450 direct jobs during construction.
  • Generating local economic activity during construction and operations.
  • Utilising North Queensland’s Industrial might and expertise by providing opportunities for local businesses and suppliers.
  • Support for the Burdekin’s community-led projects and initiatives.
  • Up to 10 additional permanent jobs will be required to ensure the effective operation of the expanded solar farm, with further contractor opportunities also anticipated.

 

Community benefit sharing

Pacific Blue is proud to support communities that host our clean energy projects through our industry-leading Community Benefit Sharing Program, which delivers a portion of revenue back into our local communities each year.

The program aims to empower local communities to identify the projects and initiatives that we should support. A range of methods are used to achieve this aim (such as community funds and sponsorship), tailored to the specific needs of each area.

Since its launch, the program has delivered over $4.9 million to over 1000 community-led projects across regional Australia.

 

Our commitment to community engagement 

A key part of Pacific Blue’s successful delivery of projects is the way we engage and involve our neighbours, communities, and stakeholders throughout all stages. We use a range of tools to ensure that we engage with our communities in ways that are meaningful, transparent and relevant to the stakeholder groups concerned including developing our own Community Engagement Framework; a bespoke set of parameters specifically developed to empower community engagement staff to make decisions in collaboration with the community. 

Pacific Blue adheres to the International Association of Public Participation (IAP2) methodology and principles for stakeholder engagement and is a signatory to the Clean Energy Council’s Charter for Best Practice Community Engagement.

 

Working with Traditional Owners

As part of our commitment to the local community, we are now including a portion of work that is to be performed by Aboriginal and Torres Strait Islander (ATSI) people in our construction contracts. Pacific Blue Engineering, Procurement and Construction (EPC) tender documentation now includes a section specifically detailing the minimum percentage for Indigenous participation. 

We are proud to have signed a Memorandum of Understanding (MoU) with the Gudjada Aboriginal Corporation on Procurement, Training, and Employment Opportunities for Aboriginal and Torres Strait Islander people and have engaged with Burdekin Shire Council regarding the promotion of the QLD Government’s free TAFE programs to help young workers prepare for a career in the energy transition.

Pacific Blue will continue to work with the Bindal people to explore opportunities for ongoing Indigenous engagement throughout the delivery and operation of the solar farm. Below is a video speaking to Eddie Smallwood, Gudjuda Ranger from the Bindal community.

 

Procurement opportunities

The Haughton Solar Farm 2 (HAU2) and Haughton BESS (HBESS) projects are to design, construct, commission and maintain a 300 MW Solar Farm and a 200MW BESS located on land owned by Pacific Blue and adjacent to the 100MW first stage of the solar farm that became operational in 2019 and a 65MVAr Synchronous Condenser that became operational in 2021. 

The Haughton Stage 2 Expansion and BESS Project was approved by the Burdekin Shire Council in 2024.

The scope of work for the Projects is to engage suitably qualified contractors to Design, Construct and Commission a new Solar Farm (Haughton Solar Farm 2) with a connected capacity of 300MW as well as a 200MW BESS (Haughton BESS), including the associated substations adjacent to the existing Haughton Solar Farm asset.

The Project will comprise the following elements:

All surveys, studies, modelling, testing and data compilation necessary to support the Project’s development to:

  • Support the grid connection process.
  • Civil construction, supply, installation and commissioning management.
  • any other tasks required for delivery of the work per Responsibility Matrix Technical Specification and EPC Contract.
Register your interest here.

 

Timeline

Pacific Blue is currently progressing the proposed Haughton Battery Energy Storage System (BESS), a key project that will strengthen the performance and reliability of renewable energy in North Queensland.

There are no immediate plans to commence construction of the Stage 2 expansion of Haughton Solar Farm. However, Pacific Blue remains committed to optimising its generation portfolio in line with Queensland’s evolving energy needs. The timing of any future investment decision for Stage 2 will depend on broader market conditions, including electricity supply and demand dynamics in Queensland, changes in energy consumption, the retirement of existing power stations, and the delivery of new transmission and generation infrastructure. Pacific Blue will continue to monitor these factors as they evolve.

Queensland continues to experience strong solar generation during daylight hours. The proposed Haughton BESS is intended to capture this energy and store it for use when homes and businesses most need it. By enabling renewable energy to be dispatched outside daylight hours, the BESS will help strengthen grid stability and support energy reliability across the region.

Pacific Blue is actively advancing development of the proposed Haughton BESS and we look forward to continuing engagement with the local community. Updates will be provided as the project progresses.

 

This video below by Vox helps explain some of the challenges with solar generation, which is why projects that are partnered with effective storage solutions are critical to Australia’s journey to Net-Zero.

  • Haughton BES 3D

    Artistic impression of the Haughton BESS.

  • Haughton BES 3D

    Artistic impression of the grid connection for Haughton Stage 2 and BESS.

  • A photo of rows of solar panels at Haughton solar farm phase 1.

    Solar Panels from Haughton Stage 1.

Contact Us

For more information, please email the contacts listed below.